Update to New Draft Policy on Feed-in-Tariffs Post-30 June 2019 for Solar Power Projects in Vietnam

Kết quả hình ảnh cho Solar Power Projects in Vietnam

bakerMackenzie

Recent developments

On 22 February 2019, the Ministry of Industry and Trade of Vietnam (MOIT) released an updated draft (the New Draft) of the Decision of the Prime Minister on the mechanism for encouraging the development of solar power projects in Vietnam (the Draft Decision). Significantly, the Draft Decision provides for a 2nd Feed-in-Tariff (FiT) at rates varying by location for application from 1 July 2019. Compared to the first draft, released on 29 January 2018 (First Draft), there have been certain revisions to, among other parts, the proposed tariff rates and irradiance regional classifications.

Continue reading on CVD >>

Trả lời

Mời bạn điền thông tin vào ô dưới đây hoặc kích vào một biểu tượng để đăng nhập:

WordPress.com Logo

Bạn đang bình luận bằng tài khoản WordPress.com Đăng xuất /  Thay đổi )

Google photo

Bạn đang bình luận bằng tài khoản Google Đăng xuất /  Thay đổi )

Twitter picture

Bạn đang bình luận bằng tài khoản Twitter Đăng xuất /  Thay đổi )

Facebook photo

Bạn đang bình luận bằng tài khoản Facebook Đăng xuất /  Thay đổi )

Connecting to %s